IEC-based Design & Manufacturing
Design and manufacturing can be aligned to applicable international requirements and project specifications.
QUALITY & STANDARDS
Products can be supplied with technical documents, inspection support, and export-ready records according to project requirements.
Design and manufacturing can be aligned to applicable international requirements and project specifications.
Routine test, type-test support, insulation review, temperature-rise consideration, pressure, leakage, and functional testing are planned by product type.
Welding quality, pressure and leakage testing, surface treatment, anti-corrosion protection, and export packaging are addressed for radiator supply.
Material selection, defined production processes, and inspection checkpoints support consistent delivery.
Packaging plans consider sea freight, long-distance transport, moisture protection, corrosion prevention, and impact protection.
Customer or third-party inspection can be supported according to agreed project requirements.
MANUFACTURING, TESTING & PACKING
These areas should be replaced with your factory, inspection, testing, radiator pressure test, export packing, and shipment preparation photos.
QUALITY DOCUMENTS & TRUST PROOF
Documentation support
Management-system document positions can be maintained after real files and valid scope are confirmed.
Open supporting fileAvailable according to project requirements
Product test report files can be prepared and uploaded according to confirmed project scope.
Open supporting fileProject documentation support
Transformer drawings, datasheets, and technical review files can be managed here.
Open supporting fileInspection file support
Switchgear quality inspection and factory document positions for qualified project review.
Open supporting fileInspection file support
Pressure test files for transformer radiators can be attached according to confirmed requirements.
Open supporting fileInspection file support
Leakage test records can be managed for radiator-related project documentation.
Open supporting fileCERTIFICATES & DOCUMENT SLOTS
The sample images do not represent verified certificates. Replace them with real, valid documents before public launch.
Documentation support
Management-system document positions can be maintained after real files and valid scope are confirmed.
OPEN IMAGEAvailable according to project requirements
Product test report files can be prepared and uploaded according to confirmed project scope.
OPEN IMAGEProject documentation support
Transformer drawings, datasheets, and technical review files can be managed here.
OPEN IMAGEInspection file support
Switchgear quality inspection and factory document positions for qualified project review.
OPEN IMAGEInspection file support
Pressure test files for transformer radiators can be attached according to confirmed requirements.
OPEN IMAGEInspection file support
Leakage test records can be managed for radiator-related project documentation.
OPEN IMAGECan be prepared for qualified project review
Factory inspection records and internal quality check files can be maintained here.
OPEN IMAGEDocumentation support
Patent or utility model document positions should be used only after real files are confirmed.
OPEN IMAGEProject documentation support
Export packaging records, packing photos, and logistics document support can be managed here.
OPEN IMAGEAvailable according to project requirements
Third-party inspection coordination documents can be added according to project agreements.
OPEN IMAGEDocumentation support
Product qualification files can be organized here after document scope is confirmed.
OPEN IMAGECan be prepared for qualified project review
Project-specific technical files, drawings, and delivery documents can be maintained here.
OPEN IMAGE